jmac projects

Portezuelo Transfer System
Infrastructure
Portezuelo – Neuquén
The STP is an aqueduct dedicated to the Oil & Gas industry, strategically located in the basin to supply water throughout the Bajo de Añelo area. It has a pumping capacity of over 0.70 m³/sec, a collection channel and decanter over 400 meters long, more than 2500 hp of electric pumping, and 8 km of 24” steel pipeline.

Main aqueduct
Portezuelo Bajada del Palo Aqueduct
Neuquén – Argentina
Depending on the development of the blocks, we install permanent and semi-permanent aqueducts. The semi-permanent main aqueduct Portezuelo – NODE C – Bajada del Palo, has a transport capacity greater than 0.35 m³/s and is more than 37 km long.

Comprehensive Management
Water Management
Neuquén – Argentina
We manage and execute integral water management contracts in the fields, taking care of its use and reuse after the production stages, with environmentally sustainable practices and equipment.